See our structural testing video
Long overdue video of our physical testing of the Predator Lab to prove out our calculations.
Fabricated and tested on site by our friends at HMS Engineering in Hereford. Well done Hadrian and team.
http://www.hmsengineering.co.uk/
Here we have a 2.3+ ton stapling machine on a crane. The display shows the reading from the load cell on the crane. As we lower the stapler onto the Lab the load is transferred from the crane and so the reading goes down as the load on the Lab goes up.
Embassy DESIGN
Long overdue video of our physical testing of the Predator Lab to prove out our calculations.
Fabricated and tested on site by our friends at HMS Engineering in Hereford. Well done Hadrian and team.
http://www.hmsengineering.co.uk/
Here we have a 2.3+ ton stapling machine on a crane. The display shows the reading from the load cell on the crane. As we lower the stapler onto the Lab the load is transferred from the crane and so the reading goes down as the load on the Lab goes up.
Embassy DESIGN
http://www.hmsengineering.co.uk/
EVENTS: Embassy DESIGN attending "Pressure Systems Industry: Changes to Regulations, Codes and Standards What does the future hold?" at the Institute of Mechanical Engineers, London, 14jun16.